HAB

Sora, near Frosinone

In Sora, this project and its construction has provided protection for the bed of the river Liri, and it has also made it possible to create a larger expanse of water without permanently obstructing water flow. This has made the river accessible to canoes, giving the location another important tourist attraction.

SCHEDA TECNICA 
Località:  Sora (FR)
Corso d'acqua:  Fiume Liri
Tipo:  Hard - Top
Uso:  Sbarramento per riqualificazione fluviale e valorizzazione delle strutture di fruizione delle aree protette
Potenza impegnata:  < 4,0 kW
Lunghezza complessiva:  34,40 m
Altezza:  2,30 m
Gonfiamento:  ARIA
Tempo di gonfiamento:  MAX 30 min
Tempo di sgonfiamento:  MAX 30 min

Download attachments:

logo 134x43

Via Libero Biagi, 65/8b
20099 Sesto San Giovanni MI

Tel:+39 02 393-13-083

Tel:+39 02 393-11-005

Email: info@hab.it