Using our technology and our heritage of experience and expertise, we were able to built this dam entirely in our workshops. It is part of the equipment used at a hydroelectric plant, and our solution made it possible to attain maximum rapidity of installation, necessary in this case because of the river’s particularly high flow rate. In just two days, our customer was able to put the power generation plant into action.
SCHEDA TECNICA
Località:
Lomello (PV)
Corso d’acqua:
Torrente Agogna
Tipo:
Hard -Top
Uso:
Sabrramento per opera di presa
Potenza impegnata:
3 Kw
Lunghezza complessiva:
26 m
Altezza:
0,80 m
Gonfiamento:
ARIA
Tempo di gonfiamento:
MAX 15 min
Tempo di sgonfiamento:
max 25 min
Caratteristiche della centrale elettrica
Salto complessivo:
2,80 m
Incremento di salto:
MAX 0,80 m
Portata derivata:
MAX 25 m3/s
Turbina:
N.3 COCLEE Generatore: N.3 AD ASSE ORIZZONTALE + INVERTER